150lb Bsp / NPT Stainless Steel Reducer Tee

Product description :150lb BSP / NPT Threaded Hydraulic Stainless Steel Reducer Tee TypeThreaded pipe fitting Size1/8"-4"Wall ThicknessSch10-Sch160 XS XXS STDStandardANSI,ASME,API5L,DIN,JIS,BS,,GBMaterial304 304L 316 316LPurposeconstruction,petroleum,chemical,shipb

Featured Products


Product description :

150lb BSP / NPT Threaded Hydraulic Stainless Steel Reducer Tee


 
TypeThreaded pipe fitting 
Size1/8"-4"
Wall ThicknessSch10-Sch160 XS XXS STD
StandardANSI,ASME,API5L,DIN,JIS,BS,,GB
Material304 304L 316 316L
Purposeconstruction,petroleum,chemical,shipbuilding,gas,etc
Delivery time7-30DAYS
Surface TreatmentShot blasted, rust-proof black oil
Payment termsT/T,L/C or Western Union
QualityISO9001-2000 
Pricevery competitive price


FAQ


1) Q: What's your main product? Which kinds of products are more competitive in your product range?

A: Our main products are steel flanges, pipe fittings and steel pipes.

Competitive Items: flanges in stainless steel, carbon steel, alloy steel and punching carbon steel
                                   
                                   Butt welded pipe fittings in stainless and carbon steel
                              
                                   Threaded NPT pipe fittings in stainless and carbon stee
                                   
                                   Malleable Iron ,Stainless and carbon steel pipes

2)    Q: Are you trader or factory?
       
        A: We are both . As a trader,  we have our own flange and fitting factory.
   
            We could provide the original MTC for our clients' needs.

3)    Q: How many is your MOQ? What's your payment term?

        A: Generally speaking, we don't have MOQ. Our price depends on the specific quantity.                   
 
            (The larger the quantity is, the better price will be.) 
         
           Our common payment term is TT or L/C at sight, we could also discuss it accordingly.

4)    Q: what's your largest size of flange and fitting? How long is the production cycle?
 
        A: The largest flange we could produce is 80'' and the largest fitting is 50''.
   
         In general, we spend 20-25 days in a 20-ton order. If necessary, we could make it shorter.

5)    Q: Could you produce according to the drawings?

     A: Sure. We could produce according to the provided drawings, which include forged and casted items.

6)    Q: Could you provide samples?
       
        A: Sure. We could send you free samples, while the freight will be paid by the clients. Any needs, 
           
        contact us freely.


Products show 

150lb Bsp / NPT Stainless Steel Reducer Tee
150lb Bsp / NPT Stainless Steel Reducer Tee
150lb Bsp / NPT Stainless Steel Reducer Tee
150lb Bsp / NPT Stainless Steel Reducer Tee
150lb Bsp / NPT Stainless Steel Reducer Tee






 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours